Kahak Solar Project
> All activities of a solar farm with a total capacity of 3 MW in Kahak (Takestan – Qazvin Province) including farm design, calculations, research, report preparations, as well as obtaining the certifications of related organizations has been done by Sana System IP company.
> The Power Purchase Agreement (PPA) with the Renewable Energy Organization (Department of Energy) has been signed.
> Receiving the construction permit from SATBA organization and its extension, Sana System Company experts carried out the following activities. Firstly, the solar radiation measurements of the area and other necessary data were prepared and initially studied. Based on this, the following implementation plan and activities were carried out:
- Simualtion of the energy yield
- Completion of all necessary studies (Technical studies, Grid connection calculations, Environmental study, etc.)
- Obtaining the environmental permit
- Obtaining the approval of the Cultural Heritage Organization
- Obtaining the grid connection permit
- Purchase of the suitable land
- Obtaining the land use change permit
- Site preparation and piling
- Preparation of access roads
- Preparation of the leveling and Ground soil tests
- Obtaining all necessary permits to start the solar panel Installation
- Preparing high quality components from world leading manufacturers
The project is currently under construction and will be connected to grid in the following months.